Behind the Scenes
Site Work
Real footage from our sites: our batching plant, crews and machinery at work as we build across Azad Kashmir.

Batching Plant Installation
Dadyal, AJK
Our crane and crew putting up the concrete batching plant on the Dadyal site.

Lifting the Bins into Place
Dadyal, AJK
A crane lift of the plant bins onto the steel frame, guided by our team on the ground.

Conveyor Belt Installation
Dadyal, AJK
The aggregate conveyor fitted and ready to feed the plant.

Hopper Lowered into Position
Dadyal, AJK
The aggregate hopper lowered by crane onto its steel frame.

Aggregate Batcher in Place
Dadyal, AJK
The PLD1600 aggregate batcher set up and ready for production.

Ground Works & Crane Setup
Dadyal, AJK
Excavation and crane work as the plant structure goes up.

Foundation Anchor Bolts
Dadyal, AJK
Anchor-bolt frames set in fresh concrete to hold the plant structure.

Steel Column Raised
Dadyal, AJK
A tall steel column lifted by crane and guided into place by the crew.

Conveyor Frame Assembly
Dadyal, AJK
The conveyor frame laid out and assembled with the plant rising behind it.
Start YourProject
- Pakistan+92 345 5546831
- United Kingdom+44 7440 392017
- Emailinfo@kashmirconstructiongroup.com
- Head OfficePaagliyan, Dhangali, Kallar Syedan-Dadyal Rd, Dadyal, Azad Jammu Kashmir